| Allegro CL version 8.2 Unrevised from 8.1 to 8.2. 8.1 version |
Projects have associated directories, the default location for files associated with the project. This directory is indicated on the General tab of the Project Manager dialog. When a new project is created, the New Project Directory dialog is displayed.
There is a default parent directory for project directories. That default is chosen by this dialog, which is displayed the first time a new project is created. The directory specified that first time is used as the default when new projects are created later. The default location is C:\allegro-projects, as shown in the illustration.
Copyright (c) 1998-2016, Franz Inc. Oakland, CA., USA. All rights reserved.
This page was not revised from the 8.1 page.
Created 2010.1.21.
| Allegro CL version 8.2 Unrevised from 8.1 to 8.2. 8.1 version |